Deployments

Proof, on the ground in Sarawak.

From the state's first in-building 5G to its first smart pole, here is where Demanlink is already carrying the signal, and what is rolling out next.

In-building 5G
109
5G-ready antennas · Miri

One Shell Square Miri

Sarawak's first IBC deployment. Comprehensive 5G coverage across a 13-storey headquarters, live within a month of Demanlink's launch.

Read the story →
Outdoor
1st
Smart pole in Sarawak · CelcomDigi

Smart pole handover

Installed and delivered to CelcomDigi in April 2026 before the SMA and MCMC. An 18m dual-purpose 5G structure that doubles as street lighting.

Deployment record
Towers
9
Towers · 5 divisions · 2026

State-wide tower programme

Shared structures from 24m to 40m across Miri, Kota Samarahan, Sibu, Bintulu and Sri Aman, opening capacity for CelcomDigi and U Mobile.

In construction
In-building 5G
7
Kuching landmark buildings

Kuching IBC wave

U Mobile 5G IBC rolling out through 2026 at BCCK, Viva City Mall, Menara LCDA, Baitul Makmur, DUN, Wisma Bapa Malaysia and Satria Pertiwi.

In progress
Outdoor
3
Deployment phases

Green-field corridor coverage

Macro, infill and isolated structures planned along the Pan-Borneo Highway and Sarawak ART corridor, matching the right pole to each stage.

Planning
Towers
40m
Sri Aman · shared structure

Jln Akses Sri Aman

The tallest structure in the 2026 tower pipeline, engineered as a multi-tenant macro site to anchor coverage along a growing access corridor.

Forecast handover 2026

Deployment figures are drawn from Demanlink and EdgePoint project records; pipeline dates are forecasts and may shift with permitting.